Industries / Architecture practices
How each design took shape, sheet by sheet
Drawing revisions, RFIs and coordination notes show how a design develops from first sketch to construction set. This history is what labs want. Client-owned designs can be excluded.
Check my estimateRecords that help
What usually qualifies
You pick which of these are in. Leaving any of them out is always fine.
- Project correspondenceHow scope, fees and changes are worked through with consultants.
- Revisions and drawing setsThe path from schematic design to construction documents.
- Clash and coordination logsThe clashes that arose and how your team settled them.
- Requests for informationThe way field questions are answered between design and construction teams.
What practices ask most: who owns the drawings
Your contracts may say the drawings belong to the client. Client-owned material is reviewed during scoping and can be excluded project by project. Where a contract leaves doubt, the question goes to your counsel.
Some projects, such as government or critical buildings, carry security limits on drawings and site details. Such projects can stay out altogether.
Making the copy
Everything starts under an NDA. In the de-identified copy, clients, consultants and staff become placeholders. A sample needs your approval before anything goes out, and the originals stay on your servers.
Short answers
Three things owners ask
Can we exclude one client altogether?
Yes. Whatever client, project or folder you name is excluded.
Does any of this cost us?
No. There is no cost to you, and asking for an estimate does not commit you to anything.
Are BIM models required?
No. Revision history, RFIs and correspondence may be enough on their own.